year DMM operator production cumulative opening depth seam thickness method days emp
1913 Illinois Midland Coal Co., No. 7 74,824 shaft 365 #6 7.5 RP 269 93
74,824
1914 Peabody Coal Co., No. 7 192,812 shaft 349 #6 7.5 RP 199 230
1915 615,603 shaft 349 #6 7.5 RP 273 530
1916 890,932 shaft 349 #6 7.5 RP 282 645
1917 734,733 shaft 349 #6 7.5 RP 246 562
1918 757,072 shaft 360 #6 7 RP 251 591
1919 785,343 shaft 360 #6 7 RP 261 552
1920 488,873 shaft 360 #6 7 RP 159 447
1921 827,407 shaft 360 #6 7 RP 241 590
1922 708,223 shaft 360 #6 7 RP 179 626
1923 673,914 shaft 360 #6 7 RP 175 628
1924 848,749 shaft 360 #6 7 RP 208 630
1925 1,049,708 shaft 360 #6 6.5 RP 225 745
1925b 170,185 36 789
1926 704,415 shaft 349 #6 6.5 RP
1927 749,748 shaft 349 #6 6.5 RP 141 820
1928 1,439,263 247 865
1929 986,662 shaft 360 #6 6.5 RP 165 862
1930 800,358 shaft 360 #6 6.5 RP 171 594
1931 740,218 shaft 360 #6 6.5 RP 222 527
1932 449,088 shaft 360 #6 6.5 RP
1933 1,092,412 shaft 360 #6 6.5 RP
1934 986,122 shaft 360 #6 6.5 RP 222 527
1935 1,040,435 shaft 360 #6 6.5 RP 201 507
1936 1,062,962 shaft 360 #6 6.5 RP 192 525
1937 S-2 1,216,027 shaft 360 #6 6.5 RP 207 552
1938 S-2 923,362 shaft 355 #6 6.5 RP 155 527
1939 S-2 1,081,568 shaft 355 #6 6.5 RP 178 523
1940 S-2 1,364,247 shaft 355 #6 6.5 RP 217 494
1941 S-2 1,462,657 shaft 355 #6 6.5 RP 236 513
1942 S-2 1,666,112 shaft 355 #6 6.5 RP 270 525
1943 S-2 1,788,173 shaft 355 #6 6.5 RP 282 490
1944 S-2 2,097,989 shaft 355 #6 6.5 RP 302 468
1945 S-2 2,058,964 shaft 355 #6 6.5 RP 293 470
1946 S-2 1,796,163 shaft 355 #6 6.5 RP 239 607
1947 S-2 1,988,667 shaft 355 #6 6.5 RP 273 669
1948 S-2 2,278,293 shaft 355 #6 6.5 RP 265 892
1949 S-2 1,455,426 shaft 355 #6 7.25 RP 161 835
1950 S-2 2,139,026 shaft 355 #6 7.25 RP 224 952
1951 S-2 2,147,702 shaft 355 #6 7.25 RP 210 951
1952 S-2 626,942 59 848
44,886,555
44,961,379