Production:2924
Revision as of 08:52, April 17, 2023 by Cheri (talk | contribs) (Created page with "{| class="wikitable" ! year !! operator !! address !! production !! cumulative !! opening !! depth !! seam !! thickness !! method !! days !! emp |- | 1907 || John J. Harbaugh || Chesterfield || 329 || || shaft || 48 || pocket || || RP || || |- | 1908 || || || 1,128 || || shaft || 42 || #5 || || RP || || |- | 1909 || || || 918 || || shaft || 42 || #5 || 4.5 || RP || || |- | 1910 || || || 1,296 || || shaft || 28 || #5 || 4 || RP || || |- | 1911 || ||...")
year | operator | address | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|
1907 | John J. Harbaugh | Chesterfield | 329 | shaft | 48 | RP | |||||
1908 | 1,128 | shaft | 42 | #5 | RP | ||||||
1909 | 918 | shaft | 42 | #5 | 4.5 | RP | |||||
1910 | 1,296 | shaft | 28 | #5 | 4 | RP | |||||
1911 | 1,464 | shaft | 28 | #5 | 4 | RP | |||||
1912 | 0 | ||||||||||
1913 | 0 | ||||||||||
1914 | 0 | ||||||||||
1915 | 0 | ||||||||||
1916 | 0 | 5,135 | |||||||||
1917 | J. J. Harbaugh | 505 | 505 | slope | 42 | #6 | 4.5 | ||||
5,640 |