This website or downloads from this website may be unavailable January 7th to January 14th, due to server maintenance.
ILMines (Coal Mine) Viewer should still be available at this (Link)

Production:0110001

From ILMINES WIKI
year DMM operator production cumulative opening depth seam thickness method days emp
1882 Wictom & Fleming 1,000 slope 80 #6 4.5 12 mo 8
1883 2,126 slope 80 #6 4.5 12 mo 15
1884 1,915 slope 80 #6 4.5 RP 200 2-8
5,041
1885 Joseph Fleming 1,770 slope 80 #6 4.5 RP 275 2-8
1886 1,394 slope 100 #6 4.5 RP 150 2-8
1887 1,625 slope 80 #6 4.5 RP 180 2-9
4,789
9830