year DMM operator production cumulative opening depth seam thickness method days emp
1887 Levi Hohimer 1,100 shaft 75 #5 6 RP 240 1-2
1888 1,903 180 2-4
1889 1,500 200 2-4
1890 1,863 220 3-5
1891 1,650 shaft 75 #5 5.5 RP 145 4-6
1892 2,698 shaft 75 #5 5.5 RP 200 3-7
1893 3,580 shaft 75 #5 5.5 RP 210 4-8
1894 3,354 shaft 75 #5 5.5 RP 254 5-9
17,648
1895 Langford and Huges 1,417 shaft 75 #5 5.5 RP 210 7-9
1896 1,598 shaft 75 5.5 RP 300 1-3
1897 1,825 shaft 75 5.5 RP 300 5
4,840
1898 M. A. Hohimer 954 shaft 85 #5 6 125 2
1899 1,438 shaft 69 #5 6 300 4
2,392
24880