Production:199027
year | operator | address | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|
1897 | R. L. Chaney | Crab Orchard | 200 | surface | 10 | 5.5 | 25 | 3 | |||
1898 | 400 | 600 | drift | 20 | #6 | 5.5 | 100 | 2 | |||
1899 | T. H. Willford | 270 | slope | 25 | #6 | 5.5 | 70 | 1 | |||
1900 | 260 | 25 | 5.5 | RP | 80 | 2 | |||||
1901 | 150 | 680 | 60 | 1 | |||||||
1902 | Wilford & Downs | 200 | 1 | ||||||||
1903 | Williford & Downs | 300 | 500 | drift | 20 | #6 | 5.5 | RP | 60 | 2 | |
1,780 |