Production:2928

From ILMINES WIKI
year operator address production cumulative opening depth seam thickness method days emp worked
1883 Dorris Davis Fayette 4,000 shaft 20 4 12 mo 3 6 of 120 ac
1884 2,000 shaft 20 4 RP 90 4
1885 0 6,000
1886 Davis Brothers 2,200 drift #6 6 RP 240 2-4
1887 2,410 shaft 40 #6 6 RP 250 4
1888 Chesterfield 2,612 260 5
1889 2,812
1890 2,620 12,654
18,654