Production:3529
year | DMM | operator | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|
1884 | George Reuther | 2,500 | shaft | 90 | #6 | 6 | RP | 300 | 4-8 | ||
1885 | 3,600 | shaft | 90 | #6 | 6.5 | RP | 200 | 4-8 | |||
1886 | 300 | shaft | 90 | #6 | 6.5 | RP | 225 | 4-7 | |||
1887 | 1,800 | shaft | 90 | #6 | 6.5 | RP | 250 | 4-8 | |||
1888 | 3,200 | 240 | 4-7 | ||||||||
1889 | 2,800 | 250 | 3-7 | ||||||||
1890 | 3,360 | 250 | 4-6 | ||||||||
1891 | 3,350 | shaft | 95 | #6 | 6.5 | RP | 250 | 6 | |||
1892 | 700 | shaft | 95 | #6 | 6.5 | RP | 270 | 3-5 | |||
1893 | 700 | 22,310 | shaft | 95 | #6 | 6 | RP | 270 | 3-5 |