Production:3719

From ILMINES WIKI
year DMM operator production cumulative opening depth seam thickness method days emp
1884 Grape Creek C & C, No. 5 (incl in #1) shaft 127 #6 6.58
1885 (incl in #1) drift 126 #6 6.25 265
1886 51,456 shaft 125 #6 6.25 RP 115
1887 45,700 shaft 125 #6 6.25 RP 209
1888 66,586 250
1889 72,800 208
1890 101,917 250
1891 90,431 shaft 125 #6 6.5 RP 200
1892 75,689 shaft 125 #6 6.5 RP 209
504,579
1893 Dickenson & Frazier, No. 5 55,718 shaft 125 #6 6.5 RP 201
55,718
1894 Coaster & Jacobs, No. 5 15,192 shaft 125 #6 6.5 RP 189
15,192
1895 Grape Creek, No. 5 0 shaft
0
575,489