Production:4027

From ILMINES WIKI
year DMM operator address production cumulative opening depth seam thickness method days emp
1948 L-193 McLaren Mining Co. Marion 19,166 19,166 30-35 #6 8 surface 55 6
1949 McLaren Equipment Co. 26,089 30-35 #6 8 surface 57 8
1950 24,669 25-35 #5 4.17 surface 55 12
1951 25,139 35 #5 4 surface
1952 1,809 35 #5 4 surface
1953 not listed
1954 not listed
1955 1,741 79,447 35 #5 4 surface 14 7
98,613