Production:4027
year | DMM | operator | address | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1948 | L-193 | McLaren Mining Co. | Marion | 19,166 | 19,166 | 30-35 | #6 | 8 | surface | 55 | 6 | |
1949 | McLaren Equipment Co. | 26,089 | 30-35 | #6 | 8 | surface | 57 | 8 | ||||
1950 | 24,669 | 25-35 | #5 | 4.17 | surface | 55 | 12 | |||||
1951 | 25,139 | 35 | #5 | 4 | surface | |||||||
1952 | 1,809 | 35 | #5 | 4 | surface | |||||||
1953 | not listed | |||||||||||
1954 | not listed | |||||||||||
1955 | 1,741 | 79,447 | 35 | #5 | 4 | surface | 14 | 7 | ||||
98,613 |