Production:91830023
year | DMM | operator | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|
1879 | Eliza Loyd | 1,100 | drift | 30 | 6 | 10 mo | |||||
1882 | |||||||||||
1883 | |||||||||||
1,100 | |||||||||||
1884 | Star Coal Mines, E. Loyd Mine | 3,000 | drift | #7 | 5.5 | 200 | |||||
1885 | 1,800 | drift | 60 | #7 | 5.5 | 250 | |||||
1886 | 2,250 | drift | 60 | #7 | 5.5 | 250 | |||||
7,050 | |||||||||||
8,150 |