Production:0099

From ILMINES WIKI
year operator address production cumulative opening depth seam thickness method days emp
1908 Chicago, Wilmington & Vermilion, No. 3 Streator 9,683 shaft 72 #7 5 RP 72 70
1909 107,363 shaft #7 5 RP 276 150
1910 116,576 shaft #7 5 LW 222 175
1911 96,361 shaft #7 5 LW 194 150
1912 140,802 shaft 70 #7 5 RP 256 153
1913 132,199 shaft 70 #2 5.5 LW 274 125
1914 117,896 shaft 70 #7 5.5 RP 263 130
1915 La Salle 114,654 835,534 shaft 76 #2 5 RP 256 125
1916 Chicago, Wilmington & Franklin, No. 3 Streator 83,835 83,835 shaft 76 #7 5 RP 211 182
919,369