year operator address production cumulative opening depth seam thickness method days emp
1907 La Salle County Carbon Coal Co. Cedar Point 6,755 shaft 544 #2 3.33 RP 124 60
1908 No. 5 Mine La Salle 83,409 shaft 544 #2 3.33 RP 250 158
1909 119,475 shaft 544 #2 3.33 LW 224 207
1910 131,974 shaft 375 #2 3.5 LW 206 191
1911 138,078 shaft 375 #2 3.5 LW 189 290
1912 205,374 shaft 545 #2 4 LW 220 322
1913 208,449 shaft 545 #2 3.33 LW 219 272
1914 172,781 shaft 545 #2 3.5 LW 182 274
1915 192,471 shaft 545 #2 3.5 LW 190 327
1916 Cedar Point 157,259 shaft 545 #2 3.67 LW 164 380
1917 La Salle 189,860 shaft 545 #2 3.5 LW 236 350
1918 Cedar Point 189,003 shaft 550 #2 3.33 LW 252 348
1919 142,615 shaft 550 #2 3.33 LW 200 269
1920 124,438 shaft 550 #2 3.33 LW 208 217
1921 80,593 #2 3.33 150 181
1922 40,737 76 169
1923 La Salle 45,385 shaft 545 #7/#2 3.33 LW 111 78
1924 Cedar Point 18,075 2,246,731 shaft 545 #2 3.5 LW 64 77