Jump to content
Production:0110004
From ILMINES WIKI
year |
DMM |
operator |
production |
cumulative |
opening |
depth |
seam |
thickness |
method |
days |
emp
|
1882 |
|
Peter Duncan |
868 |
|
shaft |
48 |
#6 |
4.5 |
|
5 mo |
9
|
1883 |
|
|
1,260 |
|
shaft |
45 |
#6 |
4.5 |
|
12 mo |
10
|
1884 |
|
|
1,544 |
|
shaft |
40 |
#6 |
4.5 |
RP |
200 |
3-8
|
1885 |
|
|
1,782 |
|
shaft |
40 |
#6 |
4.5 |
RP |
280 |
2-12
|
1886 |
|
|
1,297 |
|
shaft |
40 |
#6 |
4.5 |
RP |
175 |
2-9
|
1887 |
|
|
1,779 |
|
shaft |
40 |
#6 |
4.5 |
RP |
180 |
4-6
|
1888 |
|
|
2,820 |
|
|
|
|
|
|
260 |
4-8
|
1889 |
|
|
1,665 |
|
|
|
|
|
|
200 |
2-8
|
1890 |
|
|
1,510 |
|
|
|
|
|
|
175 |
2-4
|
1891 |
|
|
1,240 |
|
shaft |
40 |
#6 |
4.5 |
RP |
200 |
4-5
|
1892 |
|
|
1,237 |
|
shaft |
40 |
#6 |
4.5 |
RP |
200 |
2-4
|
1893 |
|
|
950 |
|
shaft |
30 |
#6 |
4.5 |
RP |
180 |
4-6
|
1894 |
|
|
1,112 |
|
slope |
40 |
#6 |
4.5 |
RP |
175 |
3-6
|
1895 |
|
|
1,103 |
|
slope |
40 |
#6 |
4.5 |
RP |
180 |
3-6
|
1896 |
|
|
1,000 |
|
slope |
40 |
|
4.67 |
RP |
200 |
3-5
|
1897 |
|
|
730 |
|
slope |
40 |
|
4.5 |
RP |
|
|
1898 |
|
|
547 |
|
slope |
40 |
#6 |
4.5 |
|
|
|
1899 |
|
|
360 |
|
slope |
40 |
#6 |
4.5 |
|
|
|
1900 |
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
|
22804 |
|
|
|
|
|
|
|
1901 |
|
Matthew Duncan |
1,660 |
|
slope |
30 |
#6 |
4.5 |
RP |
175 |
6
|
1902 |
|
|
2,440 |
|
|
|
|
|
|
225 |
7
|
1903 |
|
|
3,448 |
|
slope |
25 |
#6 |
4.5 |
RP |
200 |
9
|
1904 |
|
|
248 |
|
slope |
20 |
#6 |
4.5 |
RP |
70 |
3
|
|
|
|
|
7,796 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30,600 |
|
|
|
|
|
|
|