Jump to content
Production:0110025
From ILMINES WIKI
year |
DMM |
operator |
production |
cumulative |
opening |
depth |
seam |
thickness |
method |
days |
emp
|
1892 |
|
John V. Duncan |
325 |
|
shaft |
25 |
#6 |
4.5 |
RP |
125 |
2-4
|
1893 |
|
|
470 |
|
shaft |
25 |
#6 |
4.5 |
RP |
150 |
3-4
|
1894 |
|
|
1,078 |
|
shaft |
25 |
#6 |
4.5 |
RP |
225 |
3-7
|
1895 |
|
|
970 |
|
shaft |
15 |
#6 |
4.5 |
RP |
180 |
3-5
|
1896 |
|
|
728 |
|
shaft |
20 |
|
4.5 |
RP |
200 |
8winter
|
1897 |
|
|
470 |
|
shaft |
22 |
|
4.5 |
RP |
|
|
1898 |
|
|
907 |
|
shaft |
22 |
#6 |
4.5 |
|
|
|
1899 |
|
|
540 |
|
shaft |
22 |
#6 |
4.5 |
|
|
|
1900 |
|
|
672 |
|
|
22 |
|
4.5 |
RP |
180 |
2
|
1901 |
|
|
750 |
|
shaft |
22 |
#6 |
4.5 |
RP |
200 |
2
|
1902 |
|
|
1,031 |
|
|
|
|
|
|
260 |
2
|
1903 |
|
|
1,100 |
|
shaft |
25 |
#6 |
4.5 |
RP |
220 |
3
|
1904 |
|
|
1,720 |
|
shaft |
33 |
#6 |
4.5 |
RP |
200 |
5
|
1905 |
|
|
1,504 |
|
shaft |
40 |
#6 |
4.5 |
RP |
200 |
5
|
1906 |
|
|
602 |
|
slope |
20 |
#6 |
4.5 |
RP |
|
|
|
|
|
|
12867 |
|
|
|
|
|
|
|