Jump to content
Production:0110042
From ILMINES WIKI
year |
DMM |
operator |
production |
cumulative |
opening |
depth |
seam |
thickness |
method |
days |
emp
|
1905 |
|
J. P. Nelson |
720 |
|
shaft |
42 |
#6 |
4.5 |
RP |
100 |
4
|
|
|
|
|
720 |
|
|
|
|
|
|
|
1906 |
|
James Neave |
2,882 |
|
shaft |
50 |
#6 |
4.5 |
RP |
240 |
6
|
1907 |
|
|
3,200 |
|
slope |
50 |
#6 |
4.5 |
RP |
250 |
7
|
1908 |
|
|
1,660 |
|
shaft |
50 |
#6 |
4.83 |
RP |
208 |
4
|
1909 |
|
|
2,300 |
|
shaft |
50 |
#6 |
4.5 |
RP |
208 |
6
|
1910 |
|
|
6,400 |
|
drift |
50 |
#6 |
3.5 |
RP |
200 |
8
|
1911 |
|
|
542 |
|
drift |
50 |
#6 |
3.5 |
RP |
210 |
2
|
1912 |
|
|
3,296 |
|
slope |
50 |
#6 |
4.5 |
RP |
150 |
5
|
|
|
|
|
20,280 |
|
|
|
|
|
|
|
1913 |
|
Fleming & Wilkinson |
1,462 |
|
slope |
50 |
#6 |
4.5 |
RP |
125 |
5
|
|
|
|
|
1,462 |
|
|
|
|
|
|
|
1914 |
|
T. H. Wilkinson |
1,017 |
|
|
|
|
|
|
130 |
10
|
1915 |
|
|
1,661 |
|
|
|
|
|
|
240 |
5
|
1916 |
|
|
2,159 |
|
|
|
|
|
|
240 |
7
|
1917 |
|
|
2,458 |
|
|
|
|
|
|
265 |
7
|
1918 |
|
|
1,062 |
|
|
|
|
|
|
200 |
6
|
|
|
|
|
8,357 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30819 |
|
|
|
|
|
|
|