Production:0794

From ILMINES WIKI
year DMM operator address production cumulative opening depth seam thickness method days emp
1912 Golden Rule Coal Co. Lenzburg 3,042 119 12
1913 17,334 138 33
1914 47,953 151 38
1915 35,263 86 53
1916 54,575 131 65
1917 63,982 shaft 56 #6 6.83 RP 151 63
1918 71,772 shaft 60 #6 6.83 RP 171 68
1919 52,850 shaft 60 #6 6.83 RP 127 67
1920 49,792 shaft 60 #6 6.83 RP 133 70
1921 57,107 shaft 60 #6 6.83 RP 153 67
1922 56,535 shaft 60 #6 6.83 RP 110 89
1923 70,031 shaft 60 #6 6.83 RP 102 92
1924 122,827 shaft 60 #6 6.9 RP
1925 122,717 shaft 60 #6 6.9 RP 169 118
1925b 64,350 81 124
1926 101,815 shaft 60 #6 6.9 RP 135 115
1927 96,819 shaft 60 #6 6.67 RP 132 122
1928 60,633 shaft 60 #6 6.5 RP 146 98
1929 67,802 shaft 60 #6 6.67 RP 144 66
1930 50,222 shaft 60 #6 6.83 RP 103 62
1931 70,148 shaft 60 #6 6.83 RP 126 63
1932 66,748 shaft 60 #6 6.83 RP 117 63
1933 70,658 shaft 60 #6 6.83 RP 133 63
1934 74,056 shaft 60 #6 6.83 RP 151 66
1935 68,230 shaft 60 #6 6.83 RP 140 66
1936 51,607 shaft 60 #6 6.83 RP 157 48
1937 S-3 61,050 shaft 56 #6 6.83 RP 152 51
1938 S-3 50,444 shaft 56 #6 6.83 RP 124 52
1939 S-3 58,403 shaft 56 #6 6.83 RP
1940 S-3 32,381 shaft 56 #6 6.83 RP 86 52
1941 S-3 57,445 shaft 56 #6 6.83 RP 145 53
1942 S-3 85,062 shaft 56 #6 6.83 RP 207 53
1943 S-3 42,739 shaft 56 #6 6.83 RP 116 53
1944 S-3 89,973 shaft 56 #6 6.83 RP 238 63
1945 S-3 93,445 shaft 56 #6 6.83 RP 220 70
1946 S-3 90,101 shaft 56 #6 6.83 RP 186 76
1947 S-3 115,323 shaft 56 #6 6.83 RP 221 81
1948 S-3 116,646 slope 285 #6 7 RP 224 80
1949 S-3 77,928 slope 55 #6 6.5 RP 162 71
1950 S-3 81,528 slope 55 #6 6.5 RP 188 69
1951 S-3 51,231 slope 55 #6 6.5 RP 141 49
1952 S-3 41,472 slope 55 #6 6.5 RP 156 44
1953 S-3 5,354 slope 55 #6 6.5 RP 22 42
1954 S-3 1,005 2,820,398 slope 55 #6 6.5 RP 9 26