Production:0921

From ILMINES WIKI
year DMM operator address production cumulative opening depth seam thickness method days emp
1973 S-1 Amax Coal Co., Wabash Keensburg 38,313 UG 10 70
1974 Keensburg 743,536 203 272
1975 Keensburg 1,266,342 219 494
1976 Keensburg 1,822,854 210 630
1977 Keensburg 1,717,690 201 661
1978 Keensburg 1,365,462 165 713
1979 Keensburg 1,830,070 215 744
1980 Keensburg 1,966,295 227 795
1981 Keensburg 1,411,272 168 800
1982 Keensburg 2,509,918 241 859
1983 Keensburg 2,698,046 249 873
1984 Keensburg 2,544,916 slope 800 #5 7.5 RP
1985 Keensburg 2,665,930 slope 800 #5 7 RP
1986 Keensburg 2,892,505 slope 800 #5 7 RP
1987 2,957,464 800 #5 5.5
1988 2,909,845 800 #5 5.5
1989 3,001,455 800 #5 5.5
1990 3,228,971 850 #5 5.5
1991 3,711,274 850 #5 5.5
1992 2,913,730 850 #5 6.5
1993 3,431,384 850 #5 6.5
1994 3,993,838 850 #5 6.7
1995 4,097,163 750 #5 6.7
1996 3,239,695 600 #5 8
1997 1,588,024 60,545,992 850 #5 6.5
1998 Wabash Mine Holding Co. 3,995,220 850 #5 7
1999 1,295,750 850 #5 6.7
2000 1,505,399
2001 1,569,495 850 #5 6.7
2002 1,490,794 850 #5 6.7
2003 1,567,367 785 #5 6.7
2004 1,665,335 850 #5 6.7
2005 1,740,903
2006 1,175,444 850 #5 6.7
2007 386,217 16,391,924
76,937,916