Production:0952

From ILMINES WIKI
year DMM operator address production cumulative opening depth seam thickness method days emp
1972 S-20 Peabody Coal Co., Baldwin Marissa 112,418 slope 125 #6 6.5 RP
1973 1,290,604 slope 125 #6 6.5 RP
1974 1,727,405 slope 125 #6 6.5 RP
1975 1,883,646 slope 125 #6 6.5 RP
1976 1,859,542 slope 125 #6 6.5 RP
1977 1,681,638 slope 125 #6 6.5 RP
1978 1,491,488 slope 125 #6 6.5 RP
1979 1,515,986 slope 125 #6 6.5 RP
1980 1,518,857 slope 125 #6 6.5 RP
1981 1,400,900 slope 125 #6 6.5 RP
1982 1,781,600 slope 125 #6 6.5 RP
1983 1,982,831 slope 125 #6 6.5 RP
1984 2,207,108 slope 124 #6 6.5 RP
1985 1,906,942 slope 124 #6 6.5 RP
1986 1,956,761 slope 124 #6 6.5 RP
1987 1,751,879 125 #6 6.5
1988 1,705,857 125 #6 6.5
1989 1,909,400 125 #6 6.08
1990 2,024,102 125 #6 6
1991 1,859,851 125 #6 6
1992 2,024,650 125 #6 6
1993 732,179 36,325,644 125 #6 6