Production:1830006

From ILMINES WIKI
year DMM operator production cumulative opening depth seam thickness worked out days emp
1879 William Kelly 5,000 surface 10 6 mo
1882 8,000 surface 30 6 10 of 312 ac 12 mo
1883 41,084 surface 30 #7 6 11 of 312 ac 6 mo
54,084
1884 John Kelly 4,500 surface
4,500
1885 William Kelly 1,200 surface 75
1886 800 surface #6 50
1887 870 surface 12 #7 6.5 75
2,870
1888 John Kelly 1,800
1889 840
1890 800
1891 0
3,440
1892 William Kelly 800 surface 12 #7 6 120
800
65,694