Production:91830062
(Redirected from Production:1830062)
year | DMM | operator | address | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1885 | Sullivan & Braceville | Danville | 750 | drift | 50 | #7 | 5.5 | RP | 100 | |||
1886 | Isaac Braceville | Danville | 4,050 | drift | 70 | #6 | 6.33 | RP | 201 | |||
1887 | Danville | 8,000 | drift | 70 | #6 | 6.33 | RP | 250 | ||||
12,800 |