Production:199071
year | operator | address | production | cumulative | opening | depth | seam | thickness | method | days | emp |
---|---|---|---|---|---|---|---|---|---|---|---|
1913 | W. E. Connett | Crab Orchard | 200 | 200 | slope | 13 | #6 | 5.5 | RP | 50 | 3 |
1914 | Arthur Motsinger | 600 | slope | #5 | 4.5 | RP | 90 | 2 | |||
1915 | 800 | slope | 14 | #6 | 4.67 | RP | 70 | 2 | |||
1916 | 425 | 1,825 | drift | #6 | 4 | RP | 46 | 4 | |||
2,025 |