Production:2896

From ILMINES WIKI
year operator address production cumulative opening depth seam thickness method days emp
1883 Anchor Coal Co. Mt. Olive 20,000 shaft 380 #5 6.5 12 mo 20
1884 35,350 shaft 382 7 RP 225 50
1885 33,000 shaft 382 #6 7.5 RP 150 50-60
1886 28,891 117,241 shaft 382 #6 7.5 160 35-40
1887 Consolidated Coal Co. of 10,456 shaft 382 #6 7.5 RP 150 14
1888 St. Louis, Anchor 16,877 27,333 121 8
144,574