Production:2946

From ILMINES WIKI
year DMM operator production cumulative opening depth seam thickness method days emp
1905 John W. Mallergren 2,000 shaft 85 #5 5.5 RP 175 5
1906 686 shaft 95 #5 5.5 RP 70 4
2,686
1913 John W. Mallergren 103 slope 70 #5 6 RP 60 2
1914 1,909 shaft 80 #5 6.25 RP 140 4
1915 5,168 shaft 80 #5 6.17 RP 182 7
1916 6,283 shaft 80 6.17 RP 207 11
1917 6,332 shaft 80 #5 6.17 RP 250 11
1918 8,279 225 11
1919 7,346 214 14
1920 4,571 199 11
1921 7,403 222 12
1922 0
1923 6,190 200 13
1924 5,770 127 14
1925 4,968 170 14
1925b 1,160 55 9
1926 1,100 145 10
66582
69,268