Jump to content
Production:3446
From ILMINES WIKI
year |
operator |
address |
production |
cumulative |
opening |
depth |
seam |
thickness |
method |
days |
emp
|
1900 |
Ed Berry |
Exeter |
120 |
|
|
28 |
|
2.5 |
RP |
60 |
1
|
1901 |
|
|
100 |
|
drift |
|
#1 |
2.5 |
RP |
241 |
5
|
1902 |
|
|
120 |
|
|
|
|
|
|
100 |
1
|
1903 |
|
|
140 |
480 |
drift |
|
#1 |
2.5 |
RP |
86 |
1
|
|
|
|
|
|
|
|
|
|
|
|
|
1904 |
Broekett & Berry |
|
810 |
810 |
shaft |
25 |
#1 |
2.5 |
RP |
205 |
3
|
|
|
|
|
|
|
|
|
|
|
|
|
1905 |
Ed Berry |
|
800 |
|
shaft |
25 |
#1 |
2.5 |
RP |
200 |
2
|
1906 |
|
|
400 |
|
drift |
25 |
#1 |
2.5 |
RP |
150 |
2
|
1907 |
|
|
520 |
|
drift |
|
#1 |
2.5 |
RP |
150 |
3
|
1908 |
|
|
700 |
|
drift |
60 |
#2 |
2.5 |
RP |
150 |
5
|
1909 |
|
|
300 |
2,720 |
drift |
60 |
#2 |
2.5 |
RP |
140 |
1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4,010 |
|
|
|
|
|
|
|