This website or downloads from this website may be unavailable January 7th to January 14th, due to server maintenance.
ILMines (Coal Mine) Viewer should still be available at this (Link)

Production:3497

From ILMINES WIKI
year DMM operator production cumulative opening depth seam thickness method days emp
1883 John Kloess, No. 1 100 shaft 110 #6 6 2 mo 25
1884 6,680 shaft 110 #6 6 180 31
1885 26,320 shaft 110 #6 6 300 40-50
1886 28,000 shaft 120 #6 6.5 300 50-60
1887 6,500 shaft 110 #6 6 300 85
1888 48,000 240 80
1889 53,168 242 80-90
1890 46,000 225 40-80
1891 19,280 shaft 110 #6 7 RP 278 80-110
1892 24,150 shaft 110 #6 7 RP 280 38-55
1893 27,988 shaft 110 #6 7 RP 245 45-85
1894 20,756 shaft 110 #6 7 RP 180 40-44
1895 16,126 shaft 110 #6 7 RP 212 18-48
1896 6,281 329,349 shaft 110 #6 8 RP 147 18-35