Production:3745

From ILMINES WIKI
year DMM operator production cumulative opening depth seam thickness method days emp
1884 Grape Creek C & Coke Co., No. 4 (incl in No. 1) drift #6
1885 (production incl in No. 1) (incl in No. 1) 70 #6 6.5 265
1886 9,944 drift 70 #6 6.5 RP 70
1887 12,000 drift 70 #6 6.5 RP 200
1888 5,202 118
1889 5,202 126
1890 1,364 60
1891 15,052 slope 45 #6 6.5 RP 162
1892 14,533 slope 80 #6 6.5 RP 136
63,297
1893 Dickerson & Frazier, No. 4 22,285 slope 80 #6 6.5 RP 197
22,285
1894 Bunting Brothers, No. 4 16,940 slope 80 #6 6.5 RP 121
1895 4,434 slope 80 #6 6.5 RP 190
1896 4,458 drift 50 7 RP 268
1897 3,262 drift 50 7 RP 229
1898 5,422 drift 110 #6 7 208
1899 4,872 slope 20 #6 7 213
1900 6,600 20 7 RP 200
1901 0
1902 7,178 245
1903 10,354 shaft 20 #6 7 RP 283
1904 11,897 drift 80 #7 6 RP 230
1905 8,359 drift 80 #6 7 RP 216
1906 24,590 drift 80 #6 6 RP 252
1907 2,500 slope 45 #7 6 RP 300
1908 3,280 drift 50 #7 6 RP 204
114,146
199,728