Jump to content
Production:3775
From ILMINES WIKI
year |
DMM |
company |
production |
cumulative |
type |
depth |
seam |
thickness |
method |
days |
emp
|
1924 |
|
A. H. Shelton |
1,300 |
|
|
|
|
|
|
138 |
3
|
1925 |
|
|
0 |
|
|
|
|
|
|
|
|
1925 b |
|
|
2,900 |
|
|
|
|
|
|
150 |
4
|
1926 |
|
|
5,200 |
|
|
|
|
|
|
200 |
6
|
1927 |
|
|
5,000 |
|
|
|
|
|
|
200 |
3
|
1928 |
|
|
2,472 |
|
|
|
|
|
surface |
180 |
2
|
1929 |
|
|
2,000 |
18,872 |
|
|
|
|
ug |
100 |
6
|
|
|
|
|
|
|
|
|
|
|
|
|
1930 |
|
J. G. Shelton |
1,290 |
|
|
|
|
|
ug |
130 |
5
|
1931 |
|
|
2,700 |
|
|
|
|
|
ug |
152 |
5
|
1932 |
|
|
2,000 |
|
|
|
|
|
ug |
100 |
10
|
1933 |
|
Skelton Coal Co. |
1,200 |
|
|
|
|
|
ug |
93 |
6
|
1934 |
|
|
4,769 |
|
|
|
|
|
ug |
201 |
9
|
1935 |
|
|
1,163 |
|
slope |
|
#7 |
5.5 |
RP |
48 |
15
|
1936 |
|
|
4,960 |
|
slope |
|
#7 |
5.5 |
RP |
107 |
12
|
1937 |
S-6 |
|
4,901 |
|
slope |
45 |
#7 |
5.5 |
RP |
151 |
9
|
1938 |
S-6 |
|
5,623 |
|
slope |
|
#7 |
5.67 |
RP |
163 |
15
|
1939 |
S-6 |
|
5,182 |
|
slope |
45 |
#7 |
5.5 |
RP |
171 |
17
|
1940 |
S-6 |
|
7,777 |
|
slope |
45 |
#7 |
5.5 |
RP |
196 |
19
|
1941 |
S-6 |
|
6,269 |
|
slope |
90 |
#7 |
5.67 |
RP |
156 |
15
|
1942 |
S-6 |
|
6,430 |
|
|
|
|
|
|
141 |
19
|
1943 |
S-6 |
|
16,933 |
|
slope |
90 |
#7 |
5.67 |
RP |
197 |
20
|
1944 |
S-6 |
|
20,006 |
|
slope |
90 |
#7 |
5.67 |
RP |
195 |
22
|
1945 |
S-6 |
|
10,804 |
102,007 |
slope |
90 |
#7 |
5.67 |
RP |
111 |
21
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
120,879 |
|
|
|
|
|
|
|