Production:3829

From ILMINES WIKI
year DMM company production cumulative type depth seam thickness method days emp
1912 Missionfield Coal Co., No. 2 3,576 drift 121 #7 5.5 RP 163
1913 34,205 drift 100 #7 6 RP 223
1914 3,766 shaft 120 #7 6 RP 115
1915 12,711 drift 90 #7 6 RP 255
1916 88,994 drift 86 #7 6 RP 268
1917 169,268 drift 90 #7 6 RP 276
1918 178,044 490,564 278
1919 Electric Coal Co., No. 2 102,664 102,664 drift #7 5.25 RP 195
593,228