Production:3848

From ILMINES WIKI
year DMM company production cumulative type depth seam thickness method days emp
1912 Missionfield Coal Co., No. 3 2,738 slope 30 #7 5.75 RP 131
1913 48,244 slope 80 #7 6 RP 183
1914 100,191 slope 100 #7 5.67 RP 268
1915 126,610 slope 80 #7 6 RP 235
1916 131,441 slope 90 #6 6 RP 270
1917 143,855 278
1918 126,763 679,842 277
1919 Electric Coal Co., No. 3 23,667 23,667 slope 120 #7 5.5 RP
703,509