Mine Index 2259   Turns Coal Company,   Turns Mine

From ILMINES WIKI
Disclaimer
INTERPRETING A MINE SUMMARY SHEET
Unlocated Mines In: Gallatin unlocated
County: Gallatin
Quadrangle: Equality
County Coal Data: Gallatin
Shown On Map: Yes
Unlocated: No
MSHA ID:

Mine Index Number: 2259

Company Name: Turns Coal Company
Mine Name: Turns Mine
Start Date: 1902 End Date: April 1924
Type of Mine: Underground
Total acres shown: 39
Acres after map date: General Area of mining acres shown:

Shaft, Slope, Drift or Tipple Location(s)

Type County Township-Range Section Part Section
Main shaft Gallatin 9S 8E 21 NE NW NW
Air shaft Gallatin 9S 8E 21 NE NW NW

Geology

Thickness (ft)
Seam Depth (ft) Min Max Ave Mining Method
Springfield 30-40 4.58 MRP

Geological Problems Reported

Production

Company Mine Name Date Production (tons)
East Side Coal Company East Side 1902-1904 2,126
Brown Coal Company East Side 1904-1906 14,642
Vandell Mining and Coke Company East Side 1906-1910 [1] 1,145
Crescent Coal Company East Side, Crescent 1910-1917 [2] 77,113
Evans Coal and Mining Company Evans 1917-1919 38,005
Turns Coal Company Turns 1919-1924 67,022
Total Production: 200,053

Production Notes

Coal Report production (if available)

Sources of Data

Source Map Map Date Original Scale Digitized Scale Map Type
Company, 2-2-30G 3-4-1924 1:2400 1:2400 Final [3]

Annotated Bibliography (Data source - brief description of information)

Coal Reports - Production, ownership, years of operation, depth, mining method.
Directory of Illinois Coal Mines (Gallatin County) - Mine names, mine index, ownership, years of operation.
Mine notes (Gallatin County) - Mine location, seam, thickness.
ISGS field notes (Gallatin County) - Depth.
Company map, Coal Section files, 2-2-30G - Shaft locations, mine outline, mining method.

Mine Notes

Mine Images

Photographs

Notes

  1. Idle 1908-1910
  2. Idle 1916-1917
  3. The company only operated 30 days in 1924 and mined approximately 1 acre. The mined area shown on the accompanying map is the approximate size expected for the reported production. This suggests that the mine outline is complete.