Production:2693

From ILMINES WIKI
year DMM operator address production cumulative opening depth seam thickness method days emp
1913 Chicago Retort Fire Brick Co. Ottawa 5,591 slope #2 2.43 100 11
1914 0
1915 0
1916 2,000 17 #2 2 strip 200 8
1917 5,330 #2 2 strip 240 7
1918 6,000 254 3
1919 5,103 108 4
1920 10,000 120 10
1921 6,400 210 6
1922 0
1923 6,500 203 6
1924 6,000 240 5
1925 6,000 220 4
1925b 0
1926 0
1927 0
1928 4,780 strip 150 3
1929 4,000 strip 100 4
1930 4,000 ug 250 5
1931 3,500 ug 200 4
1932 3,100 strip 60 2
1933 1,400 strip 175 4
1934 2,280 strip 25 2
1935 2,800 strip
1936 6,885 strip 260 5
1937 L-7 6,972 strip 95 2
1938 L-7 4,765 strip 57 9
1939 L-7 4,250 strip 325 12
1940 L-7 5,388 strip 65 11
1941 L-7 7,355 strip 260 18
1942 L-7 8,804 strip 51 17
1943 L-7 8,405 strip 278 18
1944 L-7 3,500 strip 309 11
1945 L-7 5,777 strip 305 15
1946 L-7 7,123 strip 250 15
1947 L-7 9,091 strip 272 5
1948 L-7 7,255 strip 272 5
1949 L-7 6,112 strip 261 5
1950 L-7 3,088 strip 243 5
1951 L-7 2,753 182,307 strip 254 13
1952 L-7 LaClede-Christy Coal Co. 2,388 2,388 strip 246 13
1953 L-7 Chicago Retort & Fire Brick Coal Co. 2,365 strip 257 13
1954 L-7 2,186 strip 242 10
1955 L-7 2,268 6,819 strip 255 10
1956 L-7 LaClede-Christy Co., Div #102 3,203 strip 252 10
1957 L-7 7,345 strip 218 5
1958 L-7 1,324 11,872 strip 84 3
1959 L-7 H. K. Porter Co., Inc. 1,568 strip 33 4
1960 L-7 885 2,453 11 3
205,839