Mine Index 4051   Equator Coal Company,   Equator Mine

From ILMINES WIKI
Disclaimer
INTERPRETING A MINE SUMMARY SHEET
Unlocated Mines In: Williamson unlocated
County: Williamson
Quadrangle: Johnston City
County Coal Data: Williamson
Shown On Map: Yes
Unlocated: No
MSHA ID:

Mine Index Number: 4051

Company Name: Equator Coal Company
Mine Name: Equator Mine
Start Date: 1937 End Date: November 1947
Type of Mine: 2
Total acres shown: 26
Acres after map date: General Area of mining acres shown:

Shaft, Slope, Drift or Tipple Location(s)

Type County Township-Range Section Part Section
Main slope Williamson 9S 3E 6 NE NE SE
Air shaft Williamson 9S 3E 6 NE NE SE

Geology

Thickness (ft)
Seam Depth (ft) Min Max Ave Mining Method
Herrin 70 7.5-8.0 RPB

Geological Problems Reported

Production

Company Mine Name Date Production (tons)
Zeigler Coal Company Zeigler 1937-1937 200
Lauder and Hausman Red Devil 1938-1938 250
Black Crystal Coal Company Black Crystal[1] 1938-1941 10,755
Black Crystal Coal Company Black Crystal 1941-1942 3,671 [2]
Wilkins Coal Company Wilkins 1942-1944 68,878 [3]
Equator Coal Company Equator 1944-1947 110,900 [4]
Total Production: 194,654

Production Notes

Coal Report production (if available)

Sources of Data

Source Map Map Date Original Scale Digitized Scale Map Type
Company, 4103.W52 i5.1-23 8-31-1941 1:1200 1:1200 Not final

Annotated Bibliography (Data source - brief description of information)

Coal Reports - Production, ownership, years of operation.
Directory of Illinois Coal Mines (Williamson County) - Mine names, mine index, ownership, years of operation.
Mine notes (Williamson County) - Mine type, shaft locations, seam, depth, thickness, geologic problems.
Company map, ISGS map library, 4103.W52 i5.1-23 - Slope and shaft locations, mine outline, mining method.
Company map, ISGS map library, 4103.W52 i5.1-34 and microfilm document 353141 - Mine name (Red Devil).

Mine Notes

Mine Images

Photographs

Notes

  1. The name is spelled “Chrystal” on the mine map.
  2. Production after map date
  3. Production after map date
  4. Production after map date