Mine Index Number: 0799
Company Name:
|
Sahara Coal Company
|
Mine Name:
|
Sahara No. 10 Mine
|
Start Date:
|
1904
|
End Date:
|
March 1941
|
Type of Mine:
|
Underground
|
Total acres shown:
|
1,951
|
Acres after map date:
|
|
General Area of mining acres shown:
|
|
|
Shaft, Slope, Drift or Tipple Location(s)
Type
|
County
|
Township-Range
|
Section
|
Part Section
|
Main shaft (9x13)
|
Saline
|
8S 7E
|
20
|
NE NE SE
|
Air/escapement shaft
|
Saline
|
8S 7E
|
20[1]
|
|
Geology
Geological Problems Reported
A 1918 gas explosion killed two men. Northwest-southeast trending faults were persistent, although the amount of offset was not recorded on the source maps.
Production
Company
|
Mine Name
|
Date
|
Production (tons)
|
|
|
|
|
Total Production: 9,422,808
|
Production Notes
Coal Report production (if available)
Sources of Data
Microfilm, document 352794
|
3-28-1941
|
1:2400
|
1:4303
|
Final
|
Microfilm, document 352805
|
3-18-1953
|
1:2400
|
1:5959
|
Secondary source
|
Annotated Bibliography (Data source - brief description of information)
Coal Reports - Production, ownership, years of operation, geologic problems.
|
Directory of Illinois Coal Mines (Saline County) - Mine names, mine index, ownership, years of operation.
|
Mine notes (Saline County) - Mine type, shaft location, seam, depth, thickness.
|
Microfilm map, document 352794, reel 03140, frames 333-336 - Shaft location, mine outline, mining method, geologic problems.
|
Microfilm map, document 352805, reel 03140, frames 352-357 - Mine outline (small portion in NW).
|
Mine Notes
Mine Images
Photographs
Notes
- ↑ According to the 1904 Coal Report (page 340), the air and escapement shaft construction was to begin after the hoist shaft was completed in mid-October of 1904, and this shaft was to be 8 feet by 13 feet. No shaft other than the hoist shaft could be discerned on the source maps. This shaft is not shown on the accompanying map, but all mines were legally required to have another place of egress for the miners’ safety, and presumably another shaft did exist.
- ↑ The mine was under construction in June 1904. The hoist was projected to be completed in October, when the air/escape shaft would be started. No production was recorded under this name.